The project was made possible by a $191,000 Urban Greening Grant from the Imperial County Air Pollution Control District through the Assembly Bill 617 Community Emissions Reduction Program. It also represents the first project completed in the area of El Centro, which along with Heber and Calexico form the local corridor that Assembly Bill 617 has targeted with funds for statewide air pollution control initiatives.
Cattle Call Rodeo 2023
The Cattle Call Rodeo arena came to life once again in another thrilling edition of the 2023 Brawley Cattle Call Rodeo...